May 30, 2020Comments are off for this post.

Narrow footprint retaining wall and Acoustic Fence

Narrow footprint retaining wall & Acoustic Fence for Urbacon (Humberline Drive)

  • Groundbreaking completed this Noise Wall/Retaining Wall project in the spring of 2019. The client required an acoustic barrier along the perimeter of the property while also tackling some issues caused by undulating ground. This narrow footprint retaining wall solution along with the acoustic barrier on top provided them with the solution they needed.

May 30, 2020Comments are off for this post.

Noise barrier wall for Woodbridge Park Townhomes

Noise barrier wall for Woodbridge Park Townhomes

  • Groundbreaking completed this Noise Wall on a Non-Engineered berm in Vaughan, Ontario. This project required caissons up to 14m deep to accommodate the geotechnical constraints. This 5m high acoustic barrier separates the townhome development from the adjacent railway tracks.

May 30, 2020Comments are off for this post.

Noise Barrier Wall for Phelps Homes

Noise Barrier Wall for Phelps Homes

  • Groundbreaking Foundations installed a noise barrier wall in Grimsby with foundations going into rock. This project had challenges created by challenging access (working off a berm) and challenging soil due to high groundwater table. The foundation caissons were up to 9m deep with 3m of rock penetration.

May 30, 2020Comments are off for this post.

Noise Barrier Wall for City of Brampton

Noise Barrier Wall for City of Brampton

  • Groundbreaking constructed a noise barrier wall that is over 4,200 meters in length along the Williams Parkway corridor between Highway 410 & McLaughlin Rd N. This was a legacy project with the City involving an architect to incorporate intricate architectural design and finishes. This project constituted of over 1500 structural elements (galvanized steel posts) installed with precision to fit several thousand composite precast panels with specific designs and patterns within each bay.

May 30, 2020Comments are off for this post.

Noise Barrier Enclosure for City of Toronto

Noise Barrier Enclosure for City of Toronto (Toronto High Level Pumping Station)

  • Groundbreaking Foundations installed a noise barrier wall enclosure at the Toronto high level pumping station. This project had challenges created by limited access and saturated soil due to high groundwater table. The foundation caissons were 6m deep and the tolerance for the plumbness and location was extremely tight.

May 30, 2020Comments are off for this post.

Architectural Hoarding for City of Toronto

Architectural Hoarding for City of Toronto (Ashbridge’s Bay)

  • Groundbreaking Foundations installed architectural hoarding at the Ashbridge’s bay wastewater treatment plant in Toronto. This project had challenges created by difficult access as the site servicing and swale construction had been completed prior to us mobilizing. The steel panels for the metal hoarding were manufactured independently to the post installation which meant that the posts had to be installed to a very tight tolerance.

LET’S TALK
SOLUTIONS

Frame-2

CURRENT JOB POSTINGS

Copyright 2022 Groundbreaking Foundations Inc.

Group-10