May 30, 2020Comments are off for this post.

Culvert shoring for ministry of transportation

Culvert Shoring for Ministry of Transportation of Ontario (Princess falls - Hwy 403)

  • Groundbreaking Foundations installed a Secant Pile Wall (Caisson wall) for roadway protection on Hwy 403. This work had to be done at night due to the traffic and space constraints. This work required a significant amount of rock drilling on the Hamilton escarpment

May 30, 2020Comments are off for this post.

Culvert shoring for Ministry of Transportation

Culvert Shoring for Ministry of Transportation of Ontario

  • Groundbreaking Foundations installed a Soldier Pile & Lagging wall for roadway protection on Hwy 400. This work was done to facilitate a culvert extension as a result of Hwy 400 lane widening.

May 30, 2020Comments are off for this post.

Culvert shoring for City of Brampton

Culvert Shoring for City of Brampton

  • Groundbreaking Foundations installed a combination of Secant Pile Wall (Caisson wall) and Piles & Lagging wall for roadway protection on Mayfield Rd. This work had significant access constraints due to the existing configuration of Mayfield Rd. The piles were 1m in diameter, 15m deep with a minimum of 2.5m rock penetration.