Culvert Shoring for City of Brampton

  • Groundbreaking Foundations installed a combination of Secant Pile Wall (Caisson wall) and Piles & Lagging wall for roadway protection on Mayfield Rd. This work had significant access constraints due to the existing configuration of Mayfield Rd. The piles were 1m in diameter, 15m deep with a minimum of 2.5m rock penetration.