Davenport-cover-image3-1

DAVENPORT DIAMOND

TORONTO, ON - 2023

 

The Davenport Diamond Rail Grade Separation project is part of Metrolinx’s GO Expansion program. To support future two-way all-day GO service on the Barrie line, a rail grade separation is being constructed at the Davenport Diamond. The project includes construction of a new rail grade separation between GO Transit’s Barrie line and CP Rail’s North Toronto subdivision, as well as the addition of a second main line track on the Barrie line. Also included is staged demolition and reconstruction of a rail over road bridge at Bloor Street, a new electrical and communications building, a stormwater drainage system, fire life, safety and public egress, noise wall system and a pedestrian underpass at Paton Road. 

Installation of the noise barrier wall system, installation of the base cladding system and installation of the absorptive panels behind the MSE Walls, on Wallace Bridge, CP Rail Bridge, Elevated Guideway and Dupont Street Bridge for Davenport Diamont Rail Grade Separation Project.

PROJECT TEAM:

Project Manager: Nathan Petersen

Project Coordinator: Monica Vargas

Site Super Intendent/Foreman: Adam Oram/ Donald, Michel Lanteigne, Donnie,

Labourers: Andrew, Ilia, Travis, Rob, Alexis, Russel, Gavin, Shane, Paul

Co op: Hannah, Puneet, Nick

LET’S TALK
SOLUTIONS

Frame-2

CURRENT JOB POSTINGS

Copyright 2022 Groundbreaking Foundations Inc.

Group-10